- Construction regulations (ВБН) В.2.4-00013741-001:2008 Construction of oil and gas wells. Principal provisions
- State Standard of Ukraine (ДСТУ) ISO 10414-1 Petroleum industry. Testing fluids while in production. Part 1. Water-based muds (ISO 10414-1:2008, IDT)
- Company Standard 11.2-00013741-002:2008 Oil and gas fields. Early detection and prevention of oil, water and gas kicks. Procedure
- Company Standard (СОУ) 11.2-20077720-030:2008 Oil and gas wells. Casing. Principal provisions
- Company Standard 11.2-20077720-029:2008 Petroleum industry. Drilling of wells. Principal provisions
- Company Standard 11.2-20077720-035:2009 Petroleum industry. Drilling muds and chemicals. Properties
- Company Standard 11.2-13957538-001:2010 Oil and gas wells. Well pad drilling. Simultaneous drilling, production and workover at well pads in oil and gas fields in Ukraine. General technical requirements
- Company Standard 11.2-200077720-046:2011 Operations at industry facilities during well construction. General technical requirements
- Technical Specification 28.2-31174865-002:2015. Downhole screens (DS)
- Process regulation (ТР) 31174865.001:2016 Regulations for drilling of directional and horizontal wells
- Process regulation 31174865.002:2017 Regulations for muds and special fluids
- Process regulation 31174865.003:2017. Regulations for oil and gas well pad drilling
- Process regulation 31174865.004-1:2018. Regulations for specialized operations with coiled tubing units. Part 1. Acid treatments
- Process regulation 31174865.004-2:2018. Regulations for specialized operations with coiled tubing units. Part 2. Round trips during workovers
- Process regulation 31174865.004-3:2018. Regulations for specialized operations with coiled tubing units. Part 3. Application of air-foams
- Process regulation 31174865.004-4:2018. Regulations for specialized operations with coiled tubing units. Part 4. Remedial jobs in sidetracked wells
- Process regulation 31174865.004-5:2018. Regulations for specialized operations with coiled tubing units. Part 5. Downhole circulation
- Process regulation 31174865.004-6:2018. Regulations for specialized operations with coiled tubing units. Part 6. Logging and geophysics
- Process regulation 31174865.004-7:2018. Regulations for specialized operations with coiled tubing units. Part 7. Restoring circulation
- Process regulation 31174865.004-8:2018. Regulations for specialized operations with coiled tubing units. Part 8. Operations with downhole motors
- Process regulation 31174865.004-9:2018. Regulations for specialized operations with coiled tubing units. Part 9. Installation of cement plugs
- Process regulation 31174865.004-10:2018. Regulations for specialized operations with coiled tubing units. Part 10. Well workovers
- Process regulation 31174865.004-11:2018. Regulations for specialized operations with coiled tubing units. Part 11. Remedial cementing operations
- Process regulation 31174865.004-12:2018. Regulations for specialized operations with coiled tubing units. Part 12. Hydraulic and pneumatic tests
- Process regulation 31174865.004-13:2018. Regulations for specialized operations with coiled tubing units. Part 13. Using lead impression blocks as part of fishing operations
- Process regulation 31174865.004-14:2018. Regulations for specialized operations with coiled tubing units. Part 14. Safety requirements
- Process regulation 31174865.005:2018. Regulations for routine maintenance inspections of Drill Tek MWD Directional systems and non-destructive flaw detection of NMDCs
- Company Standard 31174865-01.2018. Safety guidelines for operations
- Company Standard 09.10-31174865.001:2018. Xmas trees and injection trees. Typical schematics, main parameters and technical requirements (State Standard ГОСТ 13846-89, IDT)
- Company Standard 09.10-31174865.002:2018 Blowout prevention equipment. Typical schematics, main parameters and technical requirements
- Company Standard 09.10-31174865.003:2018. Roundtrip tools and swivels. Connection sizes (State Standard ГОСТ 25468-82, IDT)
- Company Standard 09.1-31174865.001:2019 Oil and gas wells. Acid treatment using coiled tubing equipment. Process regulation
- Company Standard 09.1-31174865.002:2019 Oil and gas wells. Sand jet perforation using coiled tubing equipment. Process regulation
- Company Standard 11.2-31174865.04:2020 Oil and gas wells. Supervising for drilling and workover. Guidelines
- Company Standard 09.1-31174865.001:2022. Oil and gas wells. Muds and special fluids. Process regulation
- Company Standard 09.1-32377038.01:2022. Oil and gas wells. Simultaneous drilling, production and workover at well pads
- Company Standard 09.1-31174865.001:2023. Oil and gas wells. Muds and special fluids. General requirements
- Recommended practices for diving operations in petroleum industry
- Recommended practices for kickoff elimination operations and elimination of gas and oil blowout accidents
- Manuals for transferring into/out of safety mode for main oil pipelines (JSC Ukrtransnafta)
- Instruction on the requirements for the colors of signal and distinctive painting of pipelines, process equipment and tanks of JSC Ukrtransnafta