Well construction projects
– 155 projects for horizontal and directional wells;
– 54 projects for wells with depths over 5500m;
– 81 projects for wells with abnormally high formation pressures;
– 102 projects for wells where international contractors were engaged;
– 39 projects with hydrocarbon based muds used;
– 28 projects for workover (sidetracking).
– 54 projects for wells with depths over 5500m;
– 81 projects for wells with abnormally high formation pressures;
– 102 projects for wells where international contractors were engaged;
– 39 projects with hydrocarbon based muds used;
– 28 projects for workover (sidetracking).
0
Directional drilling services
– 60 horizontal wells;
– 38 directional wells;
– 11 wells with depths over 4000m
– 38 directional wells;
– 11 wells with depths over 4000m
0
Mud services
– over 745970m3 prepared;
– over 615457m drilled;
– 26 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
– over 615457m drilled;
– 26 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
0
Coiled tubing services
– 38 cement plugs installed;
– 49 inflow stimulations (acid treatments);
– 31 sand jet perforations;
– 402 testing operations, cleanings etc;
– 3 Velosity String.
– 49 inflow stimulations (acid treatments);
– 31 sand jet perforations;
– 402 testing operations, cleanings etc;
– 3 Velosity String.
0
Integrated project management services
– 48 horizontal wells;
– 12 directional wells;
– comprehensive package of services for construction and workover of oil and gas wells.