Well construction projects
– 149 projects for horizontal and directional wells;
– 52 projects for wells with depths over 5500m;
– 77 projects for wells with abnormally high formation pressures;
– 98 projects for wells where international contractors were engaged;
– 35 projects with hydrocarbon based muds used;
– 26 projects for workover (sidetracking).
– 52 projects for wells with depths over 5500m;
– 77 projects for wells with abnormally high formation pressures;
– 98 projects for wells where international contractors were engaged;
– 35 projects with hydrocarbon based muds used;
– 26 projects for workover (sidetracking).
0
Directional drilling services
– 60 horizontal wells;
– 37 directional wells;
– 11 wells with depths over 4000m
– 37 directional wells;
– 11 wells with depths over 4000m
0
Mud services
– over 745669m3 prepared;
– over 615457m drilled;
– 26 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
– over 615457m drilled;
– 26 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
0
Coiled tubing services
– 36 cement plugs installed;
– 38 inflow stimulations (acid treatments);
– 29 sand jet perforations;
– 378 testing operations, cleanings etc;
– 2 Velosity String.
– 38 inflow stimulations (acid treatments);
– 29 sand jet perforations;
– 378 testing operations, cleanings etc;
– 2 Velosity String.
0
Integrated project management services
– 48 horizontal wells;
– 12 directional wells;
– comprehensive package of services for construction and workover of oil and gas wells.
– 12 directional wells;
– comprehensive package of services for construction and workover of oil and gas wells.