0
Well construction projects
– 115 projects for horizontal and directional wells (including well pads);
– 39 projects for wells with depths over 5500m;
– 67 projects for wells with abnormally high formation pressures;
– 57 projects for wells where international contractors were engaged;
– 16 projects with hydrocarbon based muds used.
– 39 projects for wells with depths over 5500m;
– 67 projects for wells with abnormally high formation pressures;
– 57 projects for wells where international contractors were engaged;
– 16 projects with hydrocarbon based muds used.
0
Directional drilling services
– 39 horizontal wells;
– 32 directional wells;
– 10 wells with depths over 4000m
– 32 directional wells;
– 10 wells with depths over 4000m
0
Mud services
– over 725820m3 prepared;
– over 584700m drilled;
– 23 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
– over 584700m drilled;
– 23 wells with depths over 5000m;
– 11 wells with horizontal sections over 500m.
0
Coiled tubing services
– 24 cement plugs installed;
– 25 inflow stimulations (acid treatments);
– 21 sand jet perforations;
– 59 testing operations, cleanings etc;
– 40 testing operations with acid unit.
– 25 inflow stimulations (acid treatments);
– 21 sand jet perforations;
– 59 testing operations, cleanings etc;
– 40 testing operations with acid unit.
0
Integrated project management services
– 43 horizontal wells;
– 9 directional wells;
– comprehensive package of services for construction and workover of oil and gas wells.
– 9 directional wells;
– comprehensive package of services for construction and workover of oil and gas wells.